Expertie
Scholarships Get counselling

Scholarship

AICTE - Grant For Augmenting Infrastructure In North Eastern Region(A-GAINER)

Cash
CentralCentral Sector Scheme
Ministry of Education 8 states myScheme record
Eligibility
a. Government/ Government-aided technical/ engineering colleges/University Departments including Polytechnic Institutes of North East are entitled to the grant.
Region
8 states
Award
Cash
Deadline
Not published by the source

Overview

About A-GAINER

The applicant here is a college, never a student. AICTE's Grant for Augmenting Infrastructure in North Eastern Region, which the Council shortens to GAINER on its own scheme page and on the cover of the scheme document, is sanctioned to a government or government-aided technical institute in the North East against one named project: a water harvesting structure, a captive solar plant or generator, or a first internet connection. The myScheme record lists the beneficiary as an institution and the application mode as offline, and the money reaches the institute's account to be spent on the campus.

It is the same programme AICTE used to run as the Special Scheme for NER, covering a solar energy plant, solving the water problem and an internet connection, and the current GAINER scheme document still carries that older name on its cover. The reasoning behind each of the three heads is written into the document: hilly terrain leaves institute water supply unreliable through the dry season, large parts of urban and rural North East India do not get continuous electricity, and internet availability is below the level a technical campus needs.

The delivery arm is not AICTE's Delhi office alone. AICTE runs the scheme through IIT Guwahati, and in a press release dated 31 August 2021 the Council said the existing memorandum of understanding with the institute had been extended by two years, signed on 27 August 2021 by the AICTE Chairman and the IIT Guwahati Director, with digital connectivity added alongside solar power and water supply. The same release describes Phase-I as mentoring North East institutes in writing project proposals and running procurement, and says the extended arrangement includes IIT Guwahati training institutes on technical proposal writing for MODROBS and the Research Promotion Scheme as well (AICTE press release, 31 August 2021). For a polytechnic that has never written a funded project proposal, that mentoring is the part of GAINER worth knowing about first.

Who runs it

Provider

Ministry of Education

Central Government

Department Of Higher Education · All India Council For Technical Education (AICTE)

At a glance

Key details

LevelCentral
Scheme typeCentral Sector Scheme
CategoryEducation & Learning, Transport & Infrastructure
BeneficiariesInstitution
Benefit typeCash
Application modeOffline
Direct Benefit TransferNot published by the source
TagsGrant, Infrastructure
Source recordmyScheme, 2026-07-08official-site· 2026-07-08

Calendar

Important dates

No date is published at either end. The myScheme record leaves the opening and closing dates blank, and the institutional development schemes page carries no window and no advertisement against GAINER, where the SPICES and IDEA Lab entries on that same page each have an advertisement posted against them. An institute costing a water tender is therefore working without an announced date to plan around.

The dates that do bind arrive after sanction, and they are counted from the money rather than from the letter. A water project has two years from the receipt of the first instalment; a power or internet project has six months from receipt of the fund; an annual progress report is due while the project runs; and the utilisation certificate and statement of accounts have to reach AICTE before the balance can be claimed (GAINER scheme document).

Who can apply

Eligibility criteria

Two conditions decide it, and both sit in the scheme document: the institute has to be a government or government-aided technical or engineering college, university department or polytechnic in the North East, and it has to have been in existence for the last five years.

The application form adds a third test that the eligibility clause does not mention. Section I asks for the institute's AICTE Permanent Id, for a Chief Coordinator with a Faculty ID issued by AICTE, and for a student headcount across three academic years broken up by gender and by SC, ST and other categories (GAINER application form). An institute without a Permanent Id, or without a faculty member willing to be named as coordinator, cannot complete the first page, whatever its eligibility on paper.

The five-year clock runs on the institute. The form asks for the year of establishment of the institute, not of the department or the programme, so a long-running polytechnic that started a new engineering branch last year is counted on the older date.

a. Government/ Government-aided technical/ engineering colleges/University Departments including Polytechnic Institutes of North East are entitled to the grant.
b. The institute must be in existence for the last five years.

Who cannot apply

Exclusions

GAINER's real disqualifier is printed nowhere in the eligibility clause. It sits as a note on the last page of the application form: an institute applying for the grant should not already have been benefited under the same scheme in any form, from MHRD or AICTE or any other government funding agency, and the Head of the Institute has to certify that alongside the other documents. The wording is tied to the same scheme, so a sanction the institute has drawn under some other AICTE head is not what it shuts out.

Private self-financing institutes are outside the scheme by construction, since the eligibility clause reaches only government and government-aided institutions. AICTE approval on its own does not bring a self-financed college inside it.

One cost is excluded even for a successful applicant. The scheme document funds the setting up of an initial internet connection and states that recurring expenditure for the future has to be borne by the institution, so the monthly bandwidth bill never comes back to AICTE.

Continuation

Renewal conditions

The scheme document publishes no renewal clause, and on its own terms there is nothing here to renew. A sanction attaches to one named project, and the project closes when the completion report and the audited utilisation certificate reach AICTE.

The second instalment is often mistaken for a renewal. It is a reimbursement, released after the institute finishes the project and files the required documents, not a fresh grant for a second year of the same activity.

Where a water project genuinely runs long, the scheme keeps it alive through reporting rather than renewal: the two-year duration is built into the original sanction and the institute files an annual progress report inside it. Coming back for a second grant under the same head is where the prior-benefit certificate bites.

What you get

Award & benefits

The ceiling depends on which of the three problems the institute is solving, and the scheme document sets a separate limit and a separate deadline for each.

ProjectLimit of fundingTime allowed to complete
Solving water problemsRs 15 lakh2 years from receipt of the first instalment
Power or solar energyRs 20 lakh6 months from receipt of the fund
Internet connectionRs 5 lakh6 months from receipt of the fund

Money reaches the institute in two parts. The first instalment is an advance of 80% of the sanctioned grant, and the balance comes as reimbursement once the project is finished and the required documents are submitted, which means the institute carries the last stretch of the cost on its own books before it is paid back (GAINER scheme document).

Neither document fixes a matching share. The budget page of the application form asks the institute to declare its anticipated expenditure, the budget coming from its parent organisation, any external assistance, and only then the assistance requested from AICTE, capped at the head's ceiling. The scheme document then requires a certificate from the Principal or the competent authority in the State technical education department confirming that any expenditure over and above the AICTE grant will be met by the State Government or the college, and that the work will not be delayed for want of funds. In practice the gap between the real cost and the ceiling is the institute's problem, and AICTE wants that gap acknowledged in writing before it sanctions anything.

  • The selected institutes will have to complete the sanctioned project as per the following guidelines:
  • Project Name: Solving Water Problems Project
  • Limit of Funding: ₹ 15,00,000
  • Duration of Project: 2 years from the date of receipt of the first installment.
  • Project Name: Power/ Solar Energy Project
  • Limit of Funding: ₹ 20,00,000
  • Duration of Project: 6 months from the date of receipt of the fund for the purpose.
  • Project Name: Internet Connection Project
  • Limit of Funding: ₹ 5,00,000
  • Duration of Project: 6 months from the date of receipt of the fund for the purpose.
  • Disbursement of the Funds
  • The first installment is an advance of 80% of the sanctioned grant.
  • The second installment is reimbursement on successful completion of the project and submission of requisite documents by the institute.
  • Note: If the project is not initiated within six months, the institute shall have to refund the complete grant with accrued interest to AICTE with justification.

What to prepare

Documents required

Two rules govern the paperwork more than the checklist itself. Every page of the application form has to carry the signature and stamp of the Head of Institute, and all the essential documents travel with the form in the same envelope (steps to apply).

The essential-documents list in the scheme document is written for civil work: a plan and detailed estimates, an abstract of the estimates, a PWD or CPWD rate certificate, conformity with the schedule of rates for the region, and the mode of construction. For a solar plant, a generator or an internet connection the scheme document asks for something different, documentary proof of cost together with the purchase formalities prescribed in the General Financial Rules. The application form moves exactly one line of that checklist between its sections. The internet section swaps the PWD or CPWD rate certificate for a service provider agency's rate certificate; the solar and generator section keeps the PWD line as it stands. Both still ask for the mode of construction and for conformity with the schedule of rates for the region, which is a civil-work question put to a project that lays no foundation, so the honest answer on those rows is often an explanation rather than a document.

The last page carries an undertaking signed by the Principal, Director or Registrar under the office seal. Four promises are made in it: to abide by the rules on using the amount granted, to send progress reports on time, to file the utilisation certificate on or before the project period is over, and to return any unutilised grant, in full or in part, to the Council.

Essential Documents Required with Application Form:
(To Solve Water Problem in general)
a. Plan/detailed estimates of the project
b. Abstract of the estimates of the project
c. PWD/CPWD rate certificate of the project
d. Conformity with the norms as suggested by the AICTE and the rates are as per CSR of the region.
e. Mode of construction viz. Contract/ Departmentally (at most competitive rates) or Deposit work by the PWD.
f. A certificate from the Principal/ Competent Authority (concerned Secretary, State Government for Technical Education) that expenditure over and above AICTE grant, if any, will be met by the State Govt./ or the college and the construction will not be delayed for want of funds.
Terms and Conditions
a. Annual Progress Report should be submitted in respect of the projects.
b. After completion of the project, a Project Completion Report should be submitted.
c. Utilization Certificate and Statement of Accounts in prescribed proforma, duly audited by the Finance Officer/Account Officer has to be submitted to AICTE before claiming the balance amount as well as on completion of the project.
Procurement of Solar power energy equipment/Generator/Internet connection
a. Documentary proof of cost etc. along with the purchase procedure/formalities to be adopted as per the prescribed order formalities indicated in the GFR.
b. A certificate from the Principal/ Competent Authority (concerned Secretary, State Government for Technical Education) that expenditure over and above AICTE grant, if any, will be met by the State Govt./or the college, and the purchase will not be delayed for want of funds.

Step by step

How to apply

GAINER is filed on paper, and AICTE's own scheme page shows it. Against this scheme, the institutional development schemes page publishes three links and only three: the scheme document, a steps-to-apply note and the application form. The CAFES entry directly above it and the Grant for Organising Conference on the same page each publish a fourth, a click-here-to-apply link into the AICTE partner portal. The steps to apply set out four: download and fill the form, get the signature and stamp of the Head of Institute on every page, attach all the essential documents, and send the set by registered or speed post to the Advisor, Institutional Development Cell, All India Council for Technical Education, Nelson Mandela Marg, Vasant Kunj, New Delhi 110070.

With no portal link published for the scheme, there is no application number to quote and no status screen to refresh. What an institute can hold is the registered or speed post consignment number as proof of dispatch, and the scheme contact the scheme document publishes for follow-up, neridc@aicte-india.org or the IDC phone line. Selection surfaces as a document rather than a status: the sanction letter, which the Council sends to the institution together with the first instalment once it approves the proposal.

An institute that has not written a technical proposal before can approach the mentoring route rather than posting a weak file. IIT Guwahati's role under the extended memorandum covers training North East institutes on technical proposal writing and on the procurement process for these schemes.

  1. 1
    Apply offline

    The official links on this page lead to the application portal.

How winners are picked

Selection process

The scheme document sets out five stages. The institute submits its application, the Council screens and scrutinises it, an expert committee evaluates the applications, the Council takes the final decision keeping in view the experts' recommendations and the availability of funds for the scheme, and after approval the sanction letter and the first instalment go to the institution.

Two things follow from that wording. Availability of funds is named as a deciding factor alongside merit, so a sound proposal can wait for a year in which the head is funded. And the evaluation is a committee judgement rather than a score: the scheme document sets out no marking scheme, no weightage between the water, power and internet heads and no cut-off, so an institute cannot grade its own proposal before it posts it.

Fine print

Terms & conditions

The hardest clause in GAINER is the one about doing nothing. If the project is not initiated within six months, the institute has to refund the complete grant to AICTE with accrued interest, along with a justification for the delay. Since the six months are read from the receipt of the first instalment, a sanction that lands during an examination term still starts the clock.

Nothing here is an either-or. The scheme document stacks three separate filings on the institute, and the utilisation certificate is the one that gates the money: with the statement of accounts in the prescribed proforma, it has to be in AICTE's hands before the balance is claimed and again on completion, with the annual progress report running alongside the project and the completion report closing it. Who signs that certificate is the one point on which AICTE's two documents differ: the scheme document has it audited by the Finance Officer or Accounts Officer, while the undertaking on the last page of the application form has it authenticated by a chartered accountant on or before the project period ends. A file carrying both signatures answers either reading.

For a solar installation the scheme document splits the work across five parties in a responsibility grid, and the institute is not the party that pays the supplier.

Stage of a solar projectMarked against
Call for proposals, proposal evaluation and selectionAICTE
Submission of the proposalThe institute
TenderingAICTE, the institute and the solar PSU together
Technical specifications, site identificationThe institute with the solar PSU
Sanctioning of the projectMNRE
Issue of the purchase order, payment to the vendorThe solar PSU, as implementing agency
Supply, installation, system integration and certificationThe solar PSU with the vendor
Maintenance and trainingThe vendor

Two rows are worth a second reading. The purchase order and the payment to the vendor sit with the solar PSU, so an institute that wins a solar sanction does not run the tender to its own conclusion or pay the supplier. And sanctioning of the project is marked against the Ministry of New and Renewable Energy, which is the one place where the grid and the scheme's own processing clause, where the Council takes the final decision, do not read the same way.

Get help

Contact

Scheme questions go to neridc@aicte-india.org and technical questions to it2idc@aicte-india.org, with the phone number for the scheme published as (011) 29581340 (GAINER scheme document). Papers, as opposed to questions, are addressed to the Advisor at the Institutional Development Cell rather than to any of these mailboxes.

The same cell handles MODROB, CAFES, the conference grant, E-Shodh Sindhu, SPICES and the IDEA Lab scheme besides GAINER (Institutional Development Cell), so an institute writing in should name GAINER and the specific head, water, power or internet, in the subject line.

Questions

A-GAINER – FAQ

Frequently asked questions

From the official scheme FAQ (myScheme)

Read this

Disclaimer

Disclaimer

Scheme details are compiled from myScheme, the Government of India’s official scheme-discovery platform, and are reproduced without alteration. Amounts, deadlines and eligibility change between cycles, so always confirm on the official links above before applying. Expertie does not process applications or charge fees.

References

Sources

Written by

Expertie Editorial Team

Expertie editorial desk

Last updated verified data

Sources & References

  1. 1.myScheme (MeitY, Government of India) official-site· accessed 2026-07-08